Flexibility in Budgeting, Explained | Financial Management

UPI Study › Courses › Financial Management › Free lessons › Lesson 12.6 Free with a free account

Flexibility in Budgeting

Financial Management · Chapter 12: Financial Planning, Financing, and BudgetingSection 12.6 · lesson 64 of 739 min · free with a free account

← Corporate Budget Preparation and Top-Down ApproachesNext lesson: Budget Variance Analysis →

A free account plays all of Chapter 1 and 3 more lessons of Financial Management. Create a free account →

Earn 3 college credits for Financial ManagementRecommended for credit by NCCRS · Finance 204 · self-paced · one payment, lifetime access

In this lesson

Flexible budgets, cost behavior, and other budgeting techniques for fair control.

  • Explain why a static budget suits planning but not judging cost control
  • Classify costs as fixed, variable, or mixed within the relevant range
  • Calculate a flexible budget at the actual level of activity
  • Compare rolling, zero-based, activity-based, and incremental budgeting

Free study notes

Get this lesson's notes by email

The key points and 4 practice questions with answers, in your inbox. One email, free.

One email. Unsubscribe in one click.

Transcript

Everything said in the video, section by section (1,081 words). Read along, or search it.

Opening Story

Over Budget After Building More Bikes

Month-end at Wrenfield's bike plant. Rafael Ortiz, the plant operations manager, opens the cost report for his assembly line. Budget: $350,000. Actual: $372,000. The report says he's $22,000 over budget, and the chief executive wants an explanation. Rafael is baffled. His crew built 9,200 bikes in March, 1,200 more than the 8,000 the budget planned. So did he overspend, or did he do more work for the money? Every figure here is made up, and this is finance education, not investment advice.

Static Budget

Right for Planning, Wrong for Judging

Rafael takes the report to Mei Lin Zhou, the controller. She sees the problem at once. It compares him against a static budget, prepared for one planned level of activity, here 8,000 bikes, and never changed afterward. Activity means the work that causes cost: units built, orders processed, or hours worked. For planning, a static budget is right. Before March, Wrenfield had to commit to one volume to arrange cash, order parts, and schedule crews. But for judging, it mixes two questions. Did volume differ from plan? That's for sales and scheduling. And was the work done at the right cost?

Cost Behavior

Fixed, Variable and Mixed Costs

First, Mei sorts each cost by how it behaves when activity changes. A fixed cost stays the same in total: supervisors' salaries, insurance, equipment depreciation. That's $150,000 a month, at 7,000 bikes or 9,000. A variable cost moves in step with activity: the crew's pay per bike, packaging, and power. That's $25 for every bike built. Mixed costs, like a power bill with a standing charge plus usage, are split into those two parts. Careful with per-bike figures. Fixed cost per bike falls as volume rises: $150,000 over 8,000 bikes is $18.75, but over 9,200 it's $16.30, rounded to the cent. And these rules hold only in the relevant range, the volumes the plant handles without adding or cutting capacity.

Flexible Budget

Restating the Budget at 9,200 Bikes

Now Mei builds a flexible budget: the same cost structure, restated at the activity that actually happened. Flexible budget cost equals fixed cost, plus the variable cost per unit times the actual units. Variable cost: $25 times 9,200 bikes is $230,000. Add the fixed $150,000, and the flexible budget is $380,000. That's $30,000 above the static budget. This activity allowance is the 1,200 extra bikes times $25. The fixed cost adds nothing. Against $380,000, Rafael's actual $372,000 is $8,000 under budget. He did more work, at slightly less than the expected cost per bike. Mei withdraws the overspending query. The real question, why output ran above plan, belongs with sales and scheduling.

Works Both Ways

Lower Output Lowers the Allowance

At the monthly review, Owen Mercer, the chief executive, accepts the new figure, then asks a fair question. Doesn't this just excuse spending? Mei shows him it works both ways. Suppose the plant had built only 7,000 bikes. The flexible budget would be $150,000, plus $25 times 7,000, which is $175,000. That's $325,000 in all. Spend the full $350,000, and the static report says on budget. The flexible budget says $25,000 over, because the work didn't justify it. So the allowance rises when activity rises and falls when activity falls. Only that comparison shows cost control.

Quick Check

Flexible Budget for 3,200 Bags

Your turn, at Kestrel Bay Coffee Roasters. Josie Park's roasting room has fixed costs of $12,000 a month, and variable costs of $3 a bag. Her budget planned 4,000 bags, but she roasted only 3,200. What's the flexible budget? Pause, and work it out. B, $21,600. Variable cost is $3 times 3,200, or $9,600. Add the fixed $12,000, and you get $21,600. $24,000 is the static budget at the planned 4,000 bags. And $9,600 leaves out the fixed cost, which doesn't shrink with volume.

Benefits and Limits

Fair Comparison Within the Relevant Range

Nora Castillo, the chief financial officer, wants flexible budgets for every production line. She lists what they buy. Comparison is fair: managers answer for cost, not for volume they don't control. Control improves, because a supervisor can read the allowance for any new volume mid-month. And the firm learns how its costs behave. The limits come with it. Every cost must be sorted into fixed, variable, or mixed, which takes judgment and data. Real cost lines aren't straight. Bulk discounts, overtime premiums, and learning bend them, and the error grows far from plan. And outside the relevant range, fixed cost steps up: 12,000 bikes might need a second shift and another supervisor. So plan with the static budget, and judge with the flexible one.

Other Techniques

Rolling and Zero-Based Budgets

Mei raises a second problem. Demand had been rising for three months, yet March's budget still used the volume set last autumn. A rolling budget fixes that. As each month ends, a new month is added, so the plan always looks twelve months ahead. The cost is constant re-forecasting, so many firms keep a fixed annual budget beside it for accountability. Zero-based budgeting justifies every item of spending from zero each period. Should this activity be funded at all, and at what level? It exposes spending that survives only from habit. But it's slow, so firms apply it to support costs every few years.

More Techniques

Activity-Based, Incremental and Contingency Reserves

Activity-based budgeting starts from what drives cost. At $2.50 per order processed, 8,000 orders need $20,000, and 9,200 orders need $23,000. Incremental budgeting takes last year's figure and adds a percentage: $100,000 plus 3 percent is $103,000. It's quick, but it carries waste forward. And a contingency reserve sets aside, say, 5 percent of a $400,000 budget, or $20,000, for needs nobody can foresee. Unlike slack, the reserve is visible. The controller holds it, and it's released only on a written request. Owen likes that. Room for surprises, in the open.

Quick Check

Fixing a Marketing Budget Built on Habit

Quick check. Wrenfield's marketing budget has grown a few percent a year for ten years. No one can say what several of its programs now achieve. Which technique would fix that? Pause, and decide. A, zero-based budgeting. It asks whether each program should be funded at all, so programs kept only from habit are exposed. Incremental budgeting is the cause here: it carried last year's waste forward. A rolling budget keeps volumes current, but it doesn't question old programs.

Key Takeaways

Static and Flexible Budgets in Review

To recap. A static budget is built for one planned activity level, and it doesn't move when activity does. Flexible budget cost equals fixed cost plus the variable rate times actual units. Plan with the static budget. Judge cost control against the flexible one, so managers answer for cost, not for volume. The limits are sorting costs, cost lines that bend, and the relevant range. Rolling, zero-based, activity-based, and incremental budgets change how the figures are made, and a contingency reserve keeps room for surprises in the open.

About Financial Management at UPI Study

Financial Management (Finance 204) is a self-paced online course of 73 video lessons in 13 chapters, from financial markets and statements to valuation, risk and return, capital budgeting, cash flow analysis, the cost of capital, capital structure, dividends, market efficiency and financial planning. It carries a NCCRS credit recommendation for 3 semester credits.

Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Compare: Principles of Finance vs Financial Management

Why take it here

Why students take Financial Management with UPI Study

How companies raise and use moneyFinancial Management covers how a company raises money, invests it and manages its cash: financial markets and statements, the time value of money, valuation, capital budgeting, the cost of capital, capital structure, dividends and buybacks, market efficiency and financial planning. It is a common course in business, accounting and finance degrees.
Credit at a fraction of the priceThe same 3 credits can cost $750 or more at a US college. Here it is one payment, self-paced, with lifetime access.
Finish your degree soonerTransfer credits reduce the courses you still owe, so you can graduate earlier or lighten a heavy semester.
Strengthen an applicationA completed college-level course on an official transcript shows admissions and scholarship committees you can do the work.
Study on your own scheduleNo start dates, no deadlines. Watch the lessons, practice, and take the final when you are ready.
130,000+students helped with college creditsACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Where the credit goes

Universities that work with NCCRS

Financial Management carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.

FAQ

Questions students ask us

About Flexibility in Budgeting

What is the difference between a static budget and a flexible budget?
A static budget is prepared for one planned level of activity and does not change, while a flexible budget restates the same cost structure at the activity that actually happened. The static budget is the right tool for planning cash, parts, and crews. The flexible budget is the fair yardstick for cost control, so managers answer for cost rather than for volume they do not control.
How do you calculate a flexible budget?
Flexible budget cost equals fixed cost plus the variable cost per unit times the actual units. With fixed costs of $150,000 and $25 of variable cost per bike, a month that builds 9,200 bikes has a flexible budget of $150,000 plus $230,000, or $380,000. Actual spending of $372,000 is then $8,000 under budget, even though it is $22,000 above the static budget of $350,000.
What is the relevant range in cost accounting?
The relevant range is the span of activity a plant can handle without adding or cutting capacity, and the fixed and variable cost rules hold only inside it. Beyond that range, fixed cost steps up. For example, building 12,000 bikes instead of about 8,000 might need a second shift and another supervisor, so a flexible budget based on the old cost structure would understate the true cost.
What is zero-based budgeting?
Zero-based budgeting justifies every item of spending from zero each period, asking whether an activity should be funded at all and at what level. It exposes programs that survive only from habit, which incremental budgeting, adding a percentage to last year's figure, tends to carry forward. Because it is slow, many firms apply it to support costs every few years rather than every year.

About the Financial Management course

How many college credits is Financial Management?
Financial Management (Finance 204) carries a NCCRS credit recommendation for 3 semester credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
How much does Financial Management cost and what is included?
$250, paid once, with lifetime access: all 73 video lessons, a practice quiz after each, the graded work and final exam, and an official transcript when you finish. Students who want several courses choose UPI Study PRO instead.
Which universities accept UPI Study credits?
UPI Study has signed partner agreements with universities such as Thomas Edison State University, University of the People and Charter Oak State College, and works with universities such as Penn State, SNHU and SUNY. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities. Use "Find my college" on this page to check yours.
How long does Financial Management take?
It is self-paced with no deadlines. The 73 lessons total about 12 hours of video; most students add reading and practice time and finish in a few weeks to a few months, on their own schedule.
How are the exams done?
Quizzes and assignments are online in the course. The final exam is taken online with proctoring; a person on the UPI Study team checks assignments, usually within two days.
How do my credits reach my college?
When the course shows 100% complete, request the official transcript from your dashboard. It is sent to the college you name, and you can send it to more than one. Check your college first with "Find my college" on this page, or ask Athena.

Ready for the full course? Earn 3 credits in Financial Management.

73 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.

Updated

Financial Management
3 credits · NCCRS
Enroll →