Flexibility in Budgeting
Financial Management · Chapter 12: Financial Planning, Financing, and BudgetingSection 12.6 · lesson 64 of 739 min · free with a free account
Free preview
Create a free account to keep watching
It takes a minute and costs nothing. Your free account unlocks all of Chapter 1 and 3 more lessons of Financial Management.
Lesson complete
Earn the 3 college credits for Financial Management
Enrolling adds a quiz after each lesson, the graded work and the official transcript. Recommended for credit by NCCRS.
Next lesson: Budget Variance Analysis →← Corporate Budget Preparation and Top-Down ApproachesNext lesson: Budget Variance Analysis →
A free account plays all of Chapter 1 and 3 more lessons of Financial Management. Create a free account →
In this lesson
Flexible budgets, cost behavior, and other budgeting techniques for fair control.
- Explain why a static budget suits planning but not judging cost control
- Classify costs as fixed, variable, or mixed within the relevant range
- Calculate a flexible budget at the actual level of activity
- Compare rolling, zero-based, activity-based, and incremental budgeting
Free study notes
Get this lesson's notes by email
The key points and 4 practice questions with answers, in your inbox. One email, free.
One email. Unsubscribe in one click.
Transcript
Everything said in the video, section by section (1,081 words). Read along, or search it.
Opening Story
Over Budget After Building More Bikes
Month-end at Wrenfield's bike plant. Rafael Ortiz, the plant operations manager, opens the cost report for his assembly line. Budget: $350,000. Actual: $372,000. The report says he's $22,000 over budget, and the chief executive wants an explanation. Rafael is baffled. His crew built 9,200 bikes in March, 1,200 more than the 8,000 the budget planned. So did he overspend, or did he do more work for the money? Every figure here is made up, and this is finance education, not investment advice.
Static Budget
Right for Planning, Wrong for Judging
Rafael takes the report to Mei Lin Zhou, the controller. She sees the problem at once. It compares him against a static budget, prepared for one planned level of activity, here 8,000 bikes, and never changed afterward. Activity means the work that causes cost: units built, orders processed, or hours worked. For planning, a static budget is right. Before March, Wrenfield had to commit to one volume to arrange cash, order parts, and schedule crews. But for judging, it mixes two questions. Did volume differ from plan? That's for sales and scheduling. And was the work done at the right cost?
Cost Behavior
Fixed, Variable and Mixed Costs
First, Mei sorts each cost by how it behaves when activity changes. A fixed cost stays the same in total: supervisors' salaries, insurance, equipment depreciation. That's $150,000 a month, at 7,000 bikes or 9,000. A variable cost moves in step with activity: the crew's pay per bike, packaging, and power. That's $25 for every bike built. Mixed costs, like a power bill with a standing charge plus usage, are split into those two parts. Careful with per-bike figures. Fixed cost per bike falls as volume rises: $150,000 over 8,000 bikes is $18.75, but over 9,200 it's $16.30, rounded to the cent. And these rules hold only in the relevant range, the volumes the plant handles without adding or cutting capacity.
Flexible Budget
Restating the Budget at 9,200 Bikes
Now Mei builds a flexible budget: the same cost structure, restated at the activity that actually happened. Flexible budget cost equals fixed cost, plus the variable cost per unit times the actual units. Variable cost: $25 times 9,200 bikes is $230,000. Add the fixed $150,000, and the flexible budget is $380,000. That's $30,000 above the static budget. This activity allowance is the 1,200 extra bikes times $25. The fixed cost adds nothing. Against $380,000, Rafael's actual $372,000 is $8,000 under budget. He did more work, at slightly less than the expected cost per bike. Mei withdraws the overspending query. The real question, why output ran above plan, belongs with sales and scheduling.
Works Both Ways
Lower Output Lowers the Allowance
At the monthly review, Owen Mercer, the chief executive, accepts the new figure, then asks a fair question. Doesn't this just excuse spending? Mei shows him it works both ways. Suppose the plant had built only 7,000 bikes. The flexible budget would be $150,000, plus $25 times 7,000, which is $175,000. That's $325,000 in all. Spend the full $350,000, and the static report says on budget. The flexible budget says $25,000 over, because the work didn't justify it. So the allowance rises when activity rises and falls when activity falls. Only that comparison shows cost control.
Quick Check
Flexible Budget for 3,200 Bags
Your turn, at Kestrel Bay Coffee Roasters. Josie Park's roasting room has fixed costs of $12,000 a month, and variable costs of $3 a bag. Her budget planned 4,000 bags, but she roasted only 3,200. What's the flexible budget? Pause, and work it out. B, $21,600. Variable cost is $3 times 3,200, or $9,600. Add the fixed $12,000, and you get $21,600. $24,000 is the static budget at the planned 4,000 bags. And $9,600 leaves out the fixed cost, which doesn't shrink with volume.
Benefits and Limits
Fair Comparison Within the Relevant Range
Nora Castillo, the chief financial officer, wants flexible budgets for every production line. She lists what they buy. Comparison is fair: managers answer for cost, not for volume they don't control. Control improves, because a supervisor can read the allowance for any new volume mid-month. And the firm learns how its costs behave. The limits come with it. Every cost must be sorted into fixed, variable, or mixed, which takes judgment and data. Real cost lines aren't straight. Bulk discounts, overtime premiums, and learning bend them, and the error grows far from plan. And outside the relevant range, fixed cost steps up: 12,000 bikes might need a second shift and another supervisor. So plan with the static budget, and judge with the flexible one.
Other Techniques
Rolling and Zero-Based Budgets
Mei raises a second problem. Demand had been rising for three months, yet March's budget still used the volume set last autumn. A rolling budget fixes that. As each month ends, a new month is added, so the plan always looks twelve months ahead. The cost is constant re-forecasting, so many firms keep a fixed annual budget beside it for accountability. Zero-based budgeting justifies every item of spending from zero each period. Should this activity be funded at all, and at what level? It exposes spending that survives only from habit. But it's slow, so firms apply it to support costs every few years.
More Techniques
Activity-Based, Incremental and Contingency Reserves
Activity-based budgeting starts from what drives cost. At $2.50 per order processed, 8,000 orders need $20,000, and 9,200 orders need $23,000. Incremental budgeting takes last year's figure and adds a percentage: $100,000 plus 3 percent is $103,000. It's quick, but it carries waste forward. And a contingency reserve sets aside, say, 5 percent of a $400,000 budget, or $20,000, for needs nobody can foresee. Unlike slack, the reserve is visible. The controller holds it, and it's released only on a written request. Owen likes that. Room for surprises, in the open.
Quick Check
Fixing a Marketing Budget Built on Habit
Quick check. Wrenfield's marketing budget has grown a few percent a year for ten years. No one can say what several of its programs now achieve. Which technique would fix that? Pause, and decide. A, zero-based budgeting. It asks whether each program should be funded at all, so programs kept only from habit are exposed. Incremental budgeting is the cause here: it carried last year's waste forward. A rolling budget keeps volumes current, but it doesn't question old programs.
Key Takeaways
Static and Flexible Budgets in Review
To recap. A static budget is built for one planned activity level, and it doesn't move when activity does. Flexible budget cost equals fixed cost plus the variable rate times actual units. Plan with the static budget. Judge cost control against the flexible one, so managers answer for cost, not for volume. The limits are sorting costs, cost lines that bend, and the relevant range. Rolling, zero-based, activity-based, and incremental budgets change how the figures are made, and a contingency reserve keeps room for surprises in the open.
About Financial Management at UPI Study
Financial Management (Finance 204) is a self-paced online course of 73 video lessons in 13 chapters, from financial markets and statements to valuation, risk and return, capital budgeting, cash flow analysis, the cost of capital, capital structure, dividends, market efficiency and financial planning. It carries a NCCRS credit recommendation for 3 semester credits.
Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Enroll now → Course details Download the syllabus All Business courses Every course with PRO →
Why take it here
Why students take Financial Management with UPI Study
Where the credit goes
Universities that work with NCCRS
Financial Management carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Thomas Edison State UniversitySigned partner
University of the PeopleSigned partner
Charter Oak State CollegeSigned partner
Strayer UniversitySigned partner
Columbia Southern UniversitySigned partner
Indiana TechSigned partner
Penn StateWorks with NCCRS
Southern New Hampshire UniversityWorks with NCCRS
SUNYWorks with NCCRS
+many more cooperating universitiesFind my college →Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.
FAQ
Questions students ask us
About Flexibility in Budgeting
What is the difference between a static budget and a flexible budget?
How do you calculate a flexible budget?
What is the relevant range in cost accounting?
What is zero-based budgeting?
About the Financial Management course
How many college credits is Financial Management?
How much does Financial Management cost and what is included?
Which universities accept UPI Study credits?
How long does Financial Management take?
How are the exams done?
How do my credits reach my college?
Ready for the full course? Earn 3 credits in Financial Management.
73 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.
Updated
3 credits · NCCRSEnroll →