Types and Development of Decision-Making Models, Explained

UPI Study › Courses › Quantitative Analysis › Free lessons › Lesson 2.1 Free with a free account

Types and Development of Decision-Making Models

Quantitative Analysis · Chapter 2: Decision-Making Models and RiskSection 2.1 · lesson 5 of 5511 min · free with a free account

← Crunching Numbers for Better OutcomesNext lesson: Decision-Making Under Certainty and Risk →

Earn 3 college credits for Quantitative AnalysisRecommended for credit by NCCRS · Math 250 · self-paced · one payment, lifetime access

In this lesson

Types and development of decision-making models.

  • Name the four building blocks every decision model contains
  • Distinguish descriptive, predictive and prescriptive models
  • Match a problem to an algebraic, graphical, simulation or network form
  • Walk the six-step build process and judge when simpler is better

Transcript

Everything said in the video, section by section (1,604 words). Read along, or search it.

Decision-Making Models and Risk

Choosing the Right Framework

A factory manager has to decide how many of two products to build this week. She has limited labour, limited material, and a profit target. Intuition can get her close. It cannot tell her how close. A decision model can. A decision model is a formal representation of a decision problem. It makes the structure explicit, and it makes the problem solvable. In this section you will learn what every model is built from, and how models get classified. You will walk the six steps that turn a vague question into a working model. Then you will build one yourself, and break it on purpose to see what it really depends on.

Foundation

What a Decision Model Actually Is

Start with what actually counts as a model. It does not have to be complicated. Even a single equation qualifies, provided four things are made explicit. An objective. Decision variables. Constraints. Parameters. Miss any one of those and you have a description, not a decision model. Here is why that matters in practice. Without an objective, nothing tells you that one decision beats another. Without decision variables, there is nothing you actually control. Without constraints, every option looks feasible, including the impossible ones. And without parameters, the model has no numbers to run on. Get all four onto the page and the problem stops being a debate. It becomes something you can solve.

Building Blocks

Objective, Variables, Constraints, Parameters

Let us take each block properly, because this vocabulary comes back all term. The objective function states what you are trying to achieve. Usually something to maximise, like profit, revenue or customer satisfaction. Or something to minimise, like cost, risk or waiting time. Decision variables are the quantities you genuinely control. How many units to produce, which routes to assign, what price to set. Everything else in the model either depends on those variables, or constrains them. Constraints are the limits a feasible decision has to respect. Labour hours, machine capacity, budget, legal requirements, physical relationships. Parameters are the numerical inputs the model holds fixed for a given run. Some come from data, some from estimates, some frankly from assumption. And deliberately changing a parameter is exactly how we test sensitivity later.

Models By Purpose

Descriptive, Predictive, Prescriptive

Models get grouped by the kind of question they answer. Three classes, and they line up in time. Descriptive models explain what is. Dashboards, financial statements, statistical summaries, customer segmentation profiles. They make no forecast and no recommendation. Their value is clarity. Predictive models estimate what will be. Next month's demand. The chance a customer churns. The expected default rate on a loan portfolio. Now here is the part people skate over. A predictive model tells you what is likely. It does not tell you what to do about it. That job belongs to prescriptive models, which pair an objective function with constraints. Production schedules, vehicle routes, investment portfolios, staff rosters. Linear programming lives here.

Model Forms

Four Structural Forms

Same purpose, very different shapes. Within those three classes a model can take four structural forms. Algebraic models are equations and inequalities, with variables and parameters linked mathematically. That covers linear programming, pricing models and break-even analysis. Graphical models show the answer as a picture. Feasible regions, decision trees, influence diagrams. Useful when a problem has few variables. Simulation imitates a system over time using random sampling. It is the right pick when relationships are complex or stochastic. Monte Carlo risk analysis, queuing systems, inventory policy testing. Network models use nodes and arcs for flows, paths or connections. Shortest path routing, project scheduling, supply chain flow. Choosing the form matters as much as choosing the purpose.

Model Building

The Six-Step Model-Building Process

Building a model is a process, not one act of writing equations. Six steps take a vague business question to something that runs. Step one, problem formulation. State the question precisely. What decision is being made? Who owns it? Where is the boundary of the system? Step two, data collection. Gather the costs, the capacities, the demand history. Note which inputs are reliable and which are only estimates. That note pays off later. Step three, model construction. Write the objective, define the variables, list the constraints. Step four, validation. Compare the output against historical data or known cases. If it does not reproduce reality reasonably well, you iterate rather than push on. That loop is the whole point of the process. Step five, sensitivity testing. Vary key parameters and watch the recommendation. A decision that flips on a tiny input change is fragile. Step six is implementation, and it never really ends.

Assumptions

Which Assumptions Actually Matter

Every model simplifies reality. There is no way around that. A model that captured every detail would be as complex as the world itself. And just as hard to understand. So the goal is not to avoid assumptions. That is impossible. The goal is to know which assumptions matter. Here is the test, and it is a sharp one. An assumption matters when changing it would change the recommendation. Take a production model that assumes constant cost per unit. If cost actually rises with volume, the recommended production level may be wrong. That assumption is load bearing. Now suppose the cost is slightly off and the answer does not move. Then it is not load bearing, and it is not where your attention belongs. So list every assumption, then ask, if this were wrong, would my answer change?

Validation

Three Ways to Earn Trust in a Model

Validation answers one question. Can we trust this model? Three techniques, and they complement each other rather than compete. First, test against historical data. Run the model on a past period where you already know the actual outcome. If the output lands reasonably close to what really happened, confidence rises. Close within a tolerance the user accepts, not close in some absolute sense. Large gaps point to missing variables, or relationships that run the wrong way. Second, sensitivity analysis. Change one parameter at a time and watch the output. A stable model produces predictable, proportionate changes. A model that swings wildly on small changes is either capturing real instability, or built on weak structure. Third, expert review. Domain experts catch a forgotten constraint or a variable that does not exist in practice. It is a low cost, high value step, and it is the one no statistical test can replace.

Complexity Vs Interpretability

Why the Simpler Model Often Wins

There is a real temptation to add detail until the model looks impressive. Resist it. The simpler model is often the better one. Three reasons, and none of them are about elegance. First, trust. Decision makers must understand the model well enough to rely on its output. A model nobody can explain rarely influences a real decision. Second, data. Every extra parameter is another quantity somebody has to estimate. Bad data quickly swamps whatever you gained from the extra structure. Third, maintenance. As the business changes, every relationship has to be re-examined. Simple models survive change better. Accuracy does rise with complexity, but interpretability falls, and the sweet spot comes early. So start with the simplest model that could plausibly answer the question.

Worked Example

Building a Two-Product Production Model

Time to build one. A small factory, two products. A standard unit earns twenty dollars of profit, and a premium unit earns twenty-five. Each standard unit takes one hour of labour and two kilograms of material. Each premium unit takes two hours of labour and one kilogram of material. This week the factory has one hundred and twenty labour hours available. And one hundred and eighty kilograms of material. The question. How many of each should it produce to maximise profit? Let x be the number of standard units, and y the number of premium units. Maximise twenty x plus twenty-five y. Labour says x plus two y is at most one hundred and twenty. Material says two x plus y is at most one hundred and eighty. And both x and y must be at least zero, because you cannot build negative units.

Scenario A

Baseline: Checking the Corner Points

Now solve it. With only two variables you can solve this graphically. The constraints carve out a feasible region, and you check its corner points. The origin gives zero profit. A corner, but not a useful one. Ninety standard units and no premium gives eighteen hundred dollars. Sixty premium units and no standard gives fifteen hundred dollars. The interesting corner is where both constraints meet. Solve the two equalities together and you get eighty standard and twenty premium units. Profit is twenty times eighty, plus twenty-five times twenty. Two thousand one hundred dollars. Now notice something about that answer. Eighty plus two times twenty is exactly one hundred and twenty labour hours. Both constraints bind. The factory uses every labour hour and every kilogram, with nothing left idle.

Scenario B

Change One Parameter, Watch the Answer Move

Now break it on purpose. That is the real point of the exercise. Management revises one estimate. Each premium unit actually needs twenty per cent more labour. Two point four hours instead of two. One number changes. Labour becomes x plus two point four y, at most one hundred and twenty. Re-solve, and the recommendation moves. The corner shifts to eighty-two point one standard units, and fifteen point eight premium. Whole units round that down to eighty-two standard and fifteen premium. Profit falls to roughly two thousand and fifteen dollars, down about four per cent. Premium output drops because each premium unit now eats more of the scarce labour. So which assumptions were driving the result? Labour hours per unit, clearly. A small change there moved the schedule and the profit. Linear profit per unit is next. The model assumes price holds constant whatever the volume. And independent resource pools. If overtime costs more, the labour constraint hides a cost the model ignores. Even a four line model carries assumptions worth scrutinising, and that discipline is worth more than the equations.

About Quantitative Analysis at UPI Study

Quantitative Analysis (Math 250) is a self-paced online course of 55 video lessons in 13 chapters, from decision analysis and simulation to inventory and queuing models, project scheduling, linear programming and transportation models. It carries a NCCRS credit recommendation for 3 semester credits.

Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Compare: Statistics vs Quantitative Analysis

Why take it here

Why students take Quantitative Analysis with UPI Study

Decide with numbersQuantitative Analysis teaches the models managers use to decide under uncertainty: decision trees, simulation, inventory and queuing models, project scheduling and linear programming. It is part of many business, management, operations and supply-chain programs.
Credit at a fraction of the priceThe same 3 credits can cost $750 or more at a US college. Here it is one payment, self-paced, with lifetime access.
Finish your degree soonerTransfer credits reduce the courses you still owe, so you can graduate earlier or lighten a heavy semester.
Strengthen an applicationA completed college-level course on an official transcript shows admissions and scholarship committees you can do the work.
Study on your own scheduleNo start dates, no deadlines. Watch the lessons, practice, and take the final when you are ready.
130,000+students helped with college creditsACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Where the credit goes

Universities that work with NCCRS

Quantitative Analysis carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.

FAQ

Questions students ask us

About Types and Development of Decision-Making Models

What are the four components of a decision model?
Every decision model needs an objective, decision variables, constraints and parameters. The objective function states what to maximize or minimize, such as profit or cost. Decision variables are the quantities you control, like units to produce. Constraints are limits a feasible decision must respect, such as labor hours or budget. Parameters are the fixed numerical inputs for a given run. Missing any one leaves a description, not a solvable model.
What is the difference between descriptive, predictive, and prescriptive models?
Descriptive models explain what is, through dashboards, financial statements or customer segments, without forecasting or recommending. Predictive models estimate what will be, such as next month's demand or the chance a customer churns, but they do not say what to do. Prescriptive models recommend an action by pairing an objective function with constraints, as in production schedules, vehicle routes or staff rosters. Linear programming is a prescriptive tool.
What are the steps in building a quantitative decision model?
A common six-step process is problem formulation, data collection, model construction, validation, sensitivity testing and implementation. Formulation states the decision, its owner and the system boundary. Construction writes the objective, variables and constraints. Validation compares output with historical data or known cases, and if the model does not reproduce reality reasonably well, you loop back and revise. Sensitivity testing then checks whether small input changes flip the recommendation.
How do you tell whether a model assumption really matters?
An assumption matters when changing it would change the recommendation. In a two-product model maximizing 20x + 25y with x + 2y \le 120 labor hours and 2x + y \le 180 kg of material, the best plan is 80 standard and 20 premium units for $2,100. If premium units need 2.4 hours instead of 2, the plan shifts to about 82 and 15 units and profit falls roughly 4%, so labor time is load-bearing.

About the Quantitative Analysis course

How many college credits is Quantitative Analysis?
Quantitative Analysis (Math 250) carries a NCCRS credit recommendation for 3 semester credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
How much does Quantitative Analysis cost and what is included?
$250, paid once, with lifetime access: all 55 video lessons, a practice quiz after each, the graded work and final exam, and an official transcript when you finish. Students who want several courses choose UPI Study PRO instead.
Which universities accept UPI Study credits?
UPI Study has signed partner agreements with universities such as Thomas Edison State University, University of the People and Charter Oak State College, and works with universities such as Penn State, SNHU and SUNY. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities. Use "Find my college" on this page to check yours.
How long does Quantitative Analysis take?
It is self-paced with no deadlines. The 55 lessons total about 11 hours of video; most students add reading and practice time and finish in a few weeks to a few months, on their own schedule.
How are the exams done?
Quizzes and assignments are online in the course. The final exam is taken online with proctoring; a person on the UPI Study team checks assignments, usually within two days.
How do my credits reach my college?
When the course shows 100% complete, request the official transcript from your dashboard. It is sent to the college you name, and you can send it to more than one. Check your college first with "Find my college" on this page, or ask Athena.

Ready for the full course? Earn 3 credits in Quantitative Analysis.

55 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.

Quantitative Analysis
3 credits · NCCRS
Enroll →