UPI Study › Courses › Software Engineering › Free lessons › Lesson 13.3 Free with a free account
Assembling Teams and Assigning Roles
Software Engineering · Chapter 13: Project Management, Planning, and Agile GovernanceSection 13.3 · lesson 82 of 1036 min · free with a free account
Free preview
Create a free account to keep watching
It takes a minute and costs nothing. Your free account unlocks all of Chapter 1 and 3 more lessons of Software Engineering.
Lesson complete
Earn the 3 college credits for Software Engineering
Enrolling adds a quiz after each lesson, the graded work and the official transcript. Recommended for credit by NCCRS.
Next lesson: Planning the Agile Way: Methods and Tools →← Planning a Project: Processes, Tools, and TechniquesNext lesson: Planning the Agile Way: Methods and Tools →
In this lesson
How a team is organized shapes a project as much as any technical choice.
- Explain team structure as a deliberate project management decision
- Compare functional, cross-functional, and matrix teams
- Apply cohesion and coupling to assigning roles
- Choose a structure to fit the project at hand
Transcript
Everything said in the video, section by section (711 words). Read along, or search it.
Project Management, Planning, and Agile Governance
Assembling Teams and Assigning Roles
How a team is actually organized is a decision, whether it is made deliberately, or by default. And it shapes a project as much as any technical choice. This section covers the organizational shape a team can take, and how to assign roles within it.
A Deliberate Decision
Structure Isn't a Byproduct
A team's structure covers how people are grouped, who reports to whom, and how specialties are distributed. That is a genuine project management decision. It is not an automatic byproduct of picking a process framework. It sits at a different level than the specific roles a framework defines. It can vary with project size, organizational context, and what the project actually needs to deliver. And it coexists with whatever specific process the team runs on top of it.
Figure 1
Same Specialties, 3 Arrangements
Here are the same specialties, arranged three different ways. A functional structure groups people by specialty, in separate teams that are siloed from each other. A cross-functional structure puts the mixed specialties together, on one team. And a matrix structure crosses specialty with project, so each person reports along both lines at once.
Functional vs. Cross-functional
Depth or Delivery?
A functional team groups people by technical specialty. A frontend team, a separate backend team, and a separate Q A team. That builds deep expertise within each group. But delivering any single feature end to end requires heavy coordination across several separate teams. A cross-functional team puts the specialties a feature needs onto one team, reducing that cross-team coordination. The cost is some specialist depth, and a need for enough of each kind of work to keep every specialist genuinely busy.
Matrix Structure
2 Managers at Once
In a matrix structure, people report to two managers at once. A functional manager, based on their specialty. And a project manager, based on what they are currently working on. That allows specialists to be allocated flexibly across several concurrent projects. The cost is genuinely dual reporting lines, which need active management.
Worth Noticing
Coordination Moves - It Doesn't Vanish
Here is something worth noticing. Cross-functional teams reduce coordination between teams. But that is not the same as eliminating coordination. It simply moves inside the team. Frontend, backend, and Q A still have to coordinate with each other. They just do it as teammates, rather than across a team boundary.
Assigning Roles
Cohesion and Coupling, for People
Beyond the overall structure, assigning specific roles to individuals matters on its own. A role should match what someone's skills actually support, and be realistically scoped for one person to carry. Its responsibilities should be clear enough that nothing gets duplicated, or quietly dropped between roles. This is the same quality covered earlier for code, applied to people. A well-assigned role is cohesive, with a focused set of responsibilities. And its boundaries with other roles are not coupled in confusing, overlapping ways.
Table 1
Which Structure, When?
No team structure is universally correct. A functional team fits when deep expertise matters more than fast, end-to-end delivery. A cross-functional team fits when fast, coordinated delivery matters more than specialist depth. And a matrix fits when specialists need to be allocated flexibly across concurrent projects. It is a trade-off, weighed case by case, rather than defaulting to whatever structure happens to be in place.
Apply It
A Startup and an Enterprise
Let's apply that. A five-person startup is building one product, and needs to ship fast. Fast, tightly coordinated delivery matters most, so a cross-functional team fits. A large organization is running many similar projects at once. There, specialist consistency matters more than any single project's delivery speed. So a functional or matrix structure fits better.
Key Terms
The Vocabulary of This Section
Let's lock in the key terms. A functional team groups people by technical specialty, such as separate frontend, backend, and Q A teams. A cross-functional team puts people with the different specialties a feature needs onto one team together. A matrix structure has people report to both a functional manager and a project manager, at the same time. And role assignment is matching specific responsibilities to individuals, based on their skills and what the project needs.
Key Takeaways
What to Carry Forward
To pull this together. Team structure is a deliberate project management decision, not a byproduct of a process framework. Functional teams build depth. Cross-functional teams speed delivery. And matrix structures allow flexible allocation. Cross-functional teams move coordination inside the team. They do not remove it. Good roles are cohesive and loosely coupled, just like good code. And the right structure is the one that fits this project, not simply the one already in place.
About Software Engineering at UPI Study
Software Engineering (Computer Science 301) is a self-paced online course of 103 video lessons in 15 chapters, from process models and agile to requirements, design, user interfaces, reliability, security and project management. It carries a NCCRS credit recommendation for 3 semester credits.
Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Enroll now → Course details Download the syllabus All Computer Science courses Every course with PRO →
Why take it here
Why students take Software Engineering with UPI Study
Where the credit goes
Universities that work with NCCRS
Software Engineering carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Thomas Edison State UniversitySigned partner
University of the PeopleSigned partner
Charter Oak State CollegeSigned partner
Strayer UniversitySigned partner
Columbia Southern UniversitySigned partner
Indiana TechSigned partner
Penn StateWorks with NCCRS
Southern New Hampshire UniversityWorks with NCCRS
SUNYWorks with NCCRS
+many more cooperating universitiesFind my college →Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.
FAQ
Questions students ask us
About Assembling Teams and Assigning Roles
What is the difference between a functional team and a cross-functional team?
What is a matrix team structure in software projects?
Do cross-functional teams eliminate the need for coordination?
How do you choose the right team structure for a software project?
About the Software Engineering course
How many college credits is Software Engineering?
How much does Software Engineering cost and what is included?
Which universities accept UPI Study credits?
How long does Software Engineering take?
How are the exams done?
How do my credits reach my college?
Ready for the full course? Earn 3 credits in Software Engineering.
103 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.
3 credits · NCCRSEnroll →