Planning a Project: Processes, Tools, and Techniques
Software Engineering · Chapter 13: Project Management, Planning, and Agile GovernanceSection 13.2 · lesson 81 of 1036 min · free with a free account
Free preview
Create a free account to keep watching
It takes a minute and costs nothing. Your free account unlocks all of Chapter 1 and 3 more lessons of Software Engineering.
Lesson complete
Earn the 3 college credits for Software Engineering
Enrolling adds a quiz after each lesson, the graded work and the official transcript. Recommended for credit by NCCRS.
Next lesson: Assembling Teams and Assigning Roles →← Identifying and Managing Risk in Software ProjectsNext lesson: Assembling Teams and Assigning Roles →
In this lesson
What are we building, who is building it, and when does each piece happen?
- Explain the 3 fundamentals planning settles: scope, resources, schedule
- Describe the general planning process
- Read a Gantt chart and a PERT chart, and what each shows best
- Identify the critical path on a simple project network
Transcript
Everything said in the video, section by section (840 words). Read along, or search it.
Project Management, Planning, and Agile Governance
Planning a Project: Processes, Tools, and Techniques
Before a single line of code gets written, someone has to answer three deceptively simple questions. What are we building? Who is building it? And when does each piece happen? This section covers how project planning answers them, and two classic tools for showing a schedule.
The Fundamentals
3 Questions Planning Settles
Project planning settles three interlocking questions before work begins. Scope answers what will actually be built, and just as importantly, what will not. Resources answers who and what will do the work. People, budget, tools, and time. And schedule answers when each piece happens, and in what order. These three interlock. A larger scope demands more resources or a longer schedule. And a fixed schedule limits how much scope realistic resources can deliver. Planning means settling all three together, consistently.
Table 1
The Planning Process
However formal or informal it is, planning generally moves through the same broad stages. Define the scope. Identify the resources actually available. Then sequence and schedule the work, deciding the order of tasks and when each starts and ends. Publish the plan, so everyone is working from the same picture. And revisit it as real progress and new information arrive. That last stage is easy to treat as an afterthought. But a plan that is never revisited stops reflecting reality the moment anything changes.
Gantt Charts
The Schedule on a Calendar
A Gantt chart shows a schedule as horizontal bars, one per task, positioned along a shared timeline. Each bar's position shows when the task starts and ends. Its length shows how long it is expected to take. In this nine-week project, requirements run from week zero to week two, and design from week two to week four. Development runs from week four to week seven, testing from week six to week eight, and deployment finishes in week nine. The real strength is answering what should be happening right now. At week five, only development is underway, and nothing else starts or finishes.
Figure 2
A PERT Network and Its Critical Path
A PERT chart shows a project differently. It is a network of tasks, connected by arrows showing which tasks must finish before others can start. Where a Gantt chart emphasizes the calendar, a PERT chart emphasizes dependency. Here, requirements lead to design, design to development, and development to testing. Content prep also has to finish before development can start, but it runs on a separate branch. The highlighted chain is the critical path.
The Critical Path
The Longest Chain Sets the Pace
The critical path is the longest chain of dependent tasks, from start to finish. It sets the shortest possible time the whole project can take. Here, that is requirements, design, development, and testing. Two plus two plus three plus two, which is nine weeks. Any delay on this path delays the project. Content prep sits off the path. It reaches development in two plus one, or three weeks, compared with four weeks through design. So it has one week of slack to spare.
Table 2
Gantt vs. PERT
Here are the two tools side by side. A Gantt chart is best for showing where each task sits on the calendar. It answers, what is happening this week? A PERT chart is best for showing how tasks depend on each other. It answers, what is actually driving the project's total length?
Think About It
Does Content Prep's Timing Matter?
Think about this. Content prep is not on the critical path. So does it matter when it happens? It does, within limits. It still has to finish before development can proceed, because development depends on it. But it has some slack. It could start a little later, or take a little longer than planned, without pushing back the project's finish. As long as it still finishes before development needs it.
Apply It
Which Slip Delays the Project?
Let's apply that. Which of these slips would delay the nine-week project? If design runs one week long, the finish moves to week ten. Design is on the critical path, so every day it slips, the project slips. If content prep runs one week long, nothing changes. It simply uses up its one week of slack. But if content prep runs two weeks long, it exceeds its slack by a week. Development has to wait, and the finish moves to week ten.
Key Terms
The Vocabulary of This Section
Let's lock in the key terms. Scope is what a project will, and will not, deliver. Resources are the people, budget, tools, and time available to carry it out. A Gantt chart shows a schedule as horizontal bars along a shared timeline, showing when each task starts and ends. A PERT chart shows a schedule as a network of tasks, connected by arrows representing dependencies. And the critical path is the longest chain of dependent tasks, which sets the shortest possible time the whole project can take.
Key Takeaways
What to Carry Forward
To pull this together. Project planning settles three interlocking questions. Scope, resources, and schedule. The process moves from defining scope, through resources and scheduling, to publishing and then revisiting the plan. A Gantt chart shows tasks on a calendar timeline, making it easy to see what should be happening when. A PERT chart shows tasks as a network of dependencies, making the critical path visible. And delays on the critical path delay the whole project, while tasks off it have slack.
About Software Engineering at UPI Study
Software Engineering (Computer Science 301) is a self-paced online course of 103 video lessons in 15 chapters, from process models and agile to requirements, design, user interfaces, reliability, security and project management. It carries a NCCRS credit recommendation for 3 semester credits.
Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Enroll now → Course details Download the syllabus All Computer Science courses Every course with PRO →
Why take it here
Why students take Software Engineering with UPI Study
Where the credit goes
Universities that work with NCCRS
Software Engineering carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Thomas Edison State UniversitySigned partner
University of the PeopleSigned partner
Charter Oak State CollegeSigned partner
Strayer UniversitySigned partner
Columbia Southern UniversitySigned partner
Indiana TechSigned partner
Penn StateWorks with NCCRS
Southern New Hampshire UniversityWorks with NCCRS
SUNYWorks with NCCRS
+many more cooperating universitiesFind my college →Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.
FAQ
Questions students ask us
About Planning a Project: Processes, Tools, and Techniques
What three things does project planning settle?
What is the difference between a Gantt chart and a PERT chart?
What is the critical path in a project schedule?
What is slack in project scheduling?
About the Software Engineering course
How many college credits is Software Engineering?
How much does Software Engineering cost and what is included?
Which universities accept UPI Study credits?
How long does Software Engineering take?
How are the exams done?
How do my credits reach my college?