UPI Study › Courses › Software Engineering › Free lessons › Lesson 2.2 Free with a free account
Making Progress in Stages: Incremental Decision Models
Software Engineering · Chapter 2: Iterative, Incremental, and Specialized Process ModelsSection 2.2 · lesson 12 of 1036 min · free with a free account
Free preview
Create a free account to keep watching
It takes a minute and costs nothing. Your free account unlocks all of Chapter 1 and 3 more lessons of Software Engineering.
Lesson complete
Earn the 3 college credits for Software Engineering
Enrolling adds a quiz after each lesson, the graded work and the official transcript. Recommended for credit by NCCRS.
Next lesson: Managing Risk Through the Spiral Process →← Building Software in Cycles: The Iterative ApproachNext lesson: Managing Risk Through the Spiral Process →
In this lesson
The incremental model: functional builds, and the decisions between them.
- Describe the incremental model and its functional builds
- Distinguish incremental delivery from pure iteration
- Explain what happens at a decision point, and why it matters
- Recognize when building in stages is the better fit
Transcript
Everything said in the video, section by section (782 words). Read along, or search it.
Iterative, Incremental, and Specialized Process Models
Making Progress in Stages
What if you did not have to get everything right, before you built anything at all? This section introduces the incremental model, which delivers software in stages. It covers what makes a build an increment, how incremental delivery differs from iteration, and the decision points between increments.
2 Teams, 1 Feature
One Big Leap, or Working Pieces?
Picture two teams asked to build the same order-tracking feature for an online store. The first team disappears for four months, and returns with the entire feature finished, all at once. The second team returns after three weeks with a small, working piece. Customers can now see whether an order has shipped. Nothing else is built yet. But what exists actually runs, and real users can try it. The second team is working the way the incremental model describes. The system is split into a sequence of smaller pieces, called increments. Each is designed, built, tested, and delivered as a complete, usable build, before work on the next increment begins.
Figure 1
Increments Accumulate
Here is how the order-tracking feature grows. Increment one handles only shipped-status lookups. Increment two adds delivery estimates, and increment three adds live carrier tracking. Notice that each build keeps everything before it. By the last increment, shipped status and delivery estimates are still there, working alongside the new tracking. And between every pair of increments sits a decision point.
Table 1
What Makes a Build an Increment
The defining feature of an increment is that it is functional. Increment one is not a sketch, a mockup, or a throwaway prototype. It is a smaller version of the real system, already doing something useful from end to end. Increments accumulate. Each one adds to what earlier increments delivered, rather than replacing it. Order can matter. Increments are often sequenced so the most essential capability ships first. And scope shrinks up front. Each increment is small enough to plan and build with reasonable confidence.
Table 2
Incremental Is Not the Same as Iterative
Incremental and iterative get used loosely enough that they start to sound interchangeable. In this model, they mean different things. Pure iteration repeats a cycle of work, plan, build, review, and refine, without requiring each cycle to produce something a user could run. An iteration can exist purely to improve internal design, or work through a difficult algorithm. Incremental delivery adds a stricter requirement. Whatever comes out of the cycle has to be a working, deliverable build. Iteration often reworks the same piece. An increment adds new capability on top of what already works. Every increment is produced through some iterative work. But not every iteration results in an increment.
Think About It
Is This an Increment?
Here is a test case. A team spends two weeks reworking how its database queries are structured. Nothing the user sees has changed. Is that an increment? By the definition, no. It is iterative refinement. It becomes part of an increment only once it is bundled into a build, that also delivers something new, and usable.
Decision Points
Look at a Real Build, Then Decide
Because each increment ends with something real and working, it creates a natural pause that pure iteration does not. The people responsible can look at an actual build, not a plan or a projection, before committing to what comes next. That pause is the decision point. It is not a formality. The review is grounded in how the build actually behaves. It typically ends in one of three directions. Continue as planned. The increment met expectations, and the next proceeds as originally scoped. Adjust the scope of the next build. Something learned from the delivered increment changes what the next one should include. Or stop. The increments delivered so far already meet the need.
The Easily Missed Option
Stopping Early Leaves Nothing Broken
That third option is easy to overlook, but important. Because every increment is already usable on its own, a project built this way can end earlier than planned, without leaving anything broken or unfinished. Whatever has shipped by that point still works. Stop after increment two, and customers still have shipped status, and delivery estimates. A working system, not a half-built one.
Key Terms
The Vocabulary of This Section
Let's lock in the key terms. The incremental model delivers software as a sequence of smaller, functional builds, each adding to what came before. An increment is one complete, working, usable build. Pure iteration repeats a cycle to refine or improve something, without requiring each result to be usable on its own. And a decision point is the review after a delivered increment, where the plan is continued, adjusted, or stopped.
Key Takeaways
What to Carry Forward
To pull this together. The incremental model delivers software as a sequence of smaller, functional builds, rather than one complete system at the end. Each increment must be usable on its own, which iteration alone does not guarantee. A decision point follows every increment, and can continue, adjust, or stop the plan. And because early increments already work, stopping partway through still leaves behind a usable system.
About Software Engineering at UPI Study
Software Engineering (Computer Science 301) is a self-paced online course of 103 video lessons in 15 chapters, from process models and agile to requirements, design, user interfaces, reliability, security and project management. It carries a NCCRS credit recommendation for 3 semester credits.
Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Enroll now → Course details Download the syllabus All Computer Science courses Every course with PRO →
Why take it here
Why students take Software Engineering with UPI Study
Where the credit goes
Universities that work with NCCRS
Software Engineering carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Thomas Edison State UniversitySigned partner
University of the PeopleSigned partner
Charter Oak State CollegeSigned partner
Strayer UniversitySigned partner
Columbia Southern UniversitySigned partner
Indiana TechSigned partner
Penn StateWorks with NCCRS
Southern New Hampshire UniversityWorks with NCCRS
SUNYWorks with NCCRS
+many more cooperating universitiesFind my college →Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.
FAQ
Questions students ask us
About Making Progress in Stages: Incremental Decision Models
What is the incremental model in software engineering?
What is the difference between incremental and iterative development?
What happens at a decision point in the incremental model?
Can an incremental project stop early without failing?
About the Software Engineering course
How many college credits is Software Engineering?
How much does Software Engineering cost and what is included?
Which universities accept UPI Study credits?
How long does Software Engineering take?
How are the exams done?
How do my credits reach my college?
Ready for the full course? Earn 3 credits in Software Engineering.
103 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.
3 credits · NCCRSEnroll →