Parallel Workflows: Concurrent Development Strategies
Software Engineering · Chapter 2: Iterative, Incremental, and Specialized Process ModelsSection 2.4 · lesson 14 of 1036 min · free with a free account
Free preview
Create a free account to keep watching
It takes a minute and costs nothing. Your free account unlocks all of Chapter 1 and 3 more lessons of Software Engineering.
Lesson complete
Earn the 3 college credits for Software Engineering
Enrolling adds a quiz after each lesson, the graded work and the official transcript. Recommended for credit by NCCRS.
Next lesson: Assembling Systems: Integration and Configuration Approaches →← Managing Risk Through the Spiral ProcessNext lesson: Assembling Systems: Integration and Configuration Approaches →
In this lesson
The concurrent development model: component states, parallel progress, and coordination.
- Define the concurrent model, and how it differs from a sequential process
- Describe the states one component can be in
- Explain how components can be in different states at once
- Identify the coordination challenges of parallel work
Transcript
Everything said in the video, section by section (804 words). Read along, or search it.
Iterative, Incremental, and Specialized Process Models
Parallel Workflows
Real systems are not one single thing moving through one phase at a time. This section covers the concurrent development model, where different parts of a system progress in parallel. It covers the states a component moves through, how several components progress together, and the coordination challenges that come with it.
Beyond One Phase at a Time
Components Move at Their Own Pace
A typical system is made of multiple components, such as a user interface, a database layer, and a reporting module. Waiting for the user interface to be entirely finished, before starting the database layer, would waste enormous amounts of time. The concurrent development model addresses this directly. Instead of moving the whole system through one phase at a time, each component, or each significant activity, progresses through its own states, independently and in parallel. At any single moment, one component might be finished and in active use. A second might still be under construction. And a third might be back under revision, after failing a review. All on the same project, at the same time.
Figure 2.4(a)
One Component's States
Here are the states one component moves through. Not started, then in development, then in review. If the review approves it, the component is baselined, and eventually marked done. But if it fails review, it goes to revision, and then back to review. That loop can happen more than once. And the dashed path shows that even a finished component can re-enter development, when new requirements surface. So a component does not necessarily move through its states once, in a straight line.
Tracking State
More Precise Than "In Progress"
Rather than describing a component as simply in progress or done, the concurrent model tracks a more specific state. Not started means no work has begun. In development means it is being built. In review means it is being checked. In revision means it was sent back after failing a review. Baselined means it has been formally reviewed and approved, establishing a fixed reference point for later work. And done means complete.
Figure 2.4(b)
3 Components, 3 Timelines
The real value appears once several components are tracked side by side. Picture a user interface that is already baselined, a database layer still in development, and a reporting module back in revision after a failed review. The reporting module's revision loop delays it slightly. But it does not stall the other two. Setbacks in one component do not automatically stop the others. That independence is also exactly where the model's central risk appears. Components that progress independently usually still have to come back together. The user interface has to work with the database layer it was built alongside. That only works if the pieces are compatible when integration arrives.
Coordination Challenges
What Parallel Work Costs
Running several workstreams at once buys speed, but it creates problems a sequential process never faces. State visibility. When one team depends on another's component, it needs to know that component's current state, not last week's. Otherwise, teams build against assumptions, and integration brings surprises. Dependencies. If the reporting module relies on a database structure that changes mid-development, the reporting module may need rework, even though its own work was never wrong. Synchronization. Components move at different paces, and can reach integration at very different levels of readiness, forcing rushed, late fixes. And communication. The more workstreams run in parallel, the more effort it takes to keep everyone aware of changes elsewhere. That overhead is a genuine cost, traded against the time saved by not making every component wait its turn.
Synchronization Points
Plan When the Pieces Meet
The answer to synchronization is planning when the pieces meet. An integration checkpoint is a planned moment when independently progressing components are checked against each other, and brought together. Without these planned moments, incompatibilities tend to surface late, all at once, and under time pressure. A project with no checkpoints discovers its problems only when everything is supposedly finished. The specific tools teams use to track and merge parallel work, such as version control, are a separate topic, covered later.
Key Terms
The Vocabulary of This Section
Let's lock in the key terms. The concurrent development model lets components or activities progress through their own states, independently and in parallel. A component state is the stage a component currently occupies, such as in development, in review, in revision, baselined, or done. Baselined means formally reviewed and approved, creating a fixed reference point. An integration checkpoint is a planned moment when components are brought together, and checked for compatibility. A dependency is one component relying on another. And a workstream is one independent thread of work, running in parallel with others.
Key Takeaways
What to Carry Forward
To pull this together. The concurrent development model lets components progress through their own states in parallel, rather than moving the whole system one phase at a time. Each component's state can change independently of every other component's state. Components that progress in parallel still usually depend on each other, which is why integration checkpoints matter. And running parallel workstreams brings coordination challenges. State visibility, dependencies, synchronization, and communication overhead.
About Software Engineering at UPI Study
Software Engineering (Computer Science 301) is a self-paced online course of 103 video lessons in 15 chapters, from process models and agile to requirements, design, user interfaces, reliability, security and project management. It carries a NCCRS credit recommendation for 3 semester credits.
Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Enroll now → Course details Download the syllabus All Computer Science courses Every course with PRO →
Why take it here
Why students take Software Engineering with UPI Study
Where the credit goes
Universities that work with NCCRS
Software Engineering carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
Thomas Edison State UniversitySigned partner
University of the PeopleSigned partner
Charter Oak State CollegeSigned partner
Strayer UniversitySigned partner
Columbia Southern UniversitySigned partner
Indiana TechSigned partner
Penn StateWorks with NCCRS
Southern New Hampshire UniversityWorks with NCCRS
SUNYWorks with NCCRS
+many more cooperating universitiesFind my college →Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.
FAQ
Questions students ask us
About Parallel Workflows: Concurrent Development Strategies
What is the concurrent development model?
What states can a component be in under the concurrent model?
What are the challenges of concurrent software development?
What is an integration checkpoint?
About the Software Engineering course
How many college credits is Software Engineering?
How much does Software Engineering cost and what is included?
Which universities accept UPI Study credits?
How long does Software Engineering take?
How are the exams done?
How do my credits reach my college?
Ready for the full course? Earn 3 credits in Software Engineering.
103 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.
3 credits · NCCRSEnroll →