Walking Through the Systems Development Life Cycle, Explained

UPI Study › Courses › Software Engineering › Free lessons › Lesson 1.7 Free with a free account

Walking Through the Systems Development Life Cycle

Software Engineering · Chapter 1: Foundations of Software Engineering and Process ModelsSection 1.7 · lesson 7 of 1037 min · free with a free account

← Proven Steps and Guidelines for Building Quality SoftwareNext lesson: Common Misconceptions in Software Engineering →

Earn 3 college credits for Software EngineeringRecommended for credit by NCCRS · Computer Science 301 · self-paced · one payment, lifetime access

In this lesson

6 generic phases, from an identified need to a system people rely on.

  • Define the SDLC, and why projects rely on one
  • Name and describe the 6 generic phases in order
  • Identify each phase's goal and typical deliverable
  • Explain why early problems cost less to fix

Transcript

Everything said in the video, section by section (942 words). Read along, or search it.

Foundations of Software Engineering and Process Models

The Systems Development Life Cycle

Nearly every approach to building systems shares the same six phases underneath. This section walks through them in order, planning, analysis, design, implementation, testing, and maintenance. It covers each phase's goal and typical deliverable, and why catching a problem early costs so much less.

Why a Life Cycle

No Tower Without a Blueprint

Ask a construction crew to build an office tower with no blueprint, no permit, and no inspection plan, and the result would be chaos. Software projects fail for the same reason when they skip structure. A team starts coding before anyone agrees what the system must do. Nobody checks it works before people rely on it. And small problems pile up. The systems development life cycle, or S D L C, exists to prevent exactly that. It is a structured sequence of phases a system passes through, from the moment a need is identified, to the point it is retired or replaced. It gives every project a shared, repeatable path of checkpoints, deliverables, and responsibilities. Named models arrange, combine, or repeat the phases differently. But the six generic phases stay recognizably the same underneath.

Figure 1.7(a)

The 6 Generic Phases

Here are the six phases as a single cycle. Planning, then analysis, then design, implementation, testing, and maintenance. Notice that it is drawn as a loop, not a straight line. A system in maintenance often surfaces new needs, and those needs begin the next round of planning.

Phases 1 and 2

Why, and What

Phase one, planning, identifies why a system is needed at all. It confirms that a real problem or opportunity exists, roughly estimates the cost, time, and resources, and sets the boundaries of the project. Skip planning, and a team risks solving the wrong problem entirely, however well it executes the later phases. Phase two, analysis, gathers and documents exactly what the system must do, from the view of the people who will use it. It means talking to the people affected, studying how work is done now, and writing clear, specific requirements. Analysis becomes the standard every later phase is measured against. If a requirement was never captured here, there is nothing later to check the finished system against.

Phases 3 and 4

How, and Building It

Phase three, design, works out how the system will be built to satisfy the requirements. It decides the overall structure, how data is organized and stored, what the user interface looks like, and how the parts communicate. Where analysis answers what must the system do, design answers how will it do it. Phase four, implementation, is where the design is actually built. Writing the code, configuring the components, and assembling the pieces into a working system. It usually consumes the largest share of a project's time and effort, because every design decision now has to become something that works.

Phases 5 and 6

Checking It, and Keeping It Running

Phase five, testing, verifies that the built system does what analysis said it needed to do. It deliberately hunts for defects, checks behavior against the original requirements, and confirms the system holds up under realistic conditions. Phase six, maintenance, begins once the system is in active use, and usually lasts longer than all the other phases combined. It covers fixing defects that only appear in real-world use, adapting the system to its changing environment, and supporting the people who depend on it. And as new needs surface during maintenance, they often become the starting point for the next round of planning. That is why the life cycle is pictured as a loop.

Why the Order Matters

Each Phase Rests on the One Before

Each phase depends on the one before it being done well. A requirement missed during analysis cannot be designed around, because design has nothing to design around. A design flaw cannot be caught by testing alone, because testing checks whether the build matches the design, not whether the design was sound. The further a problem travels through the cycle before it is caught, the more work has been built on top of it, and the more has to be revisited. So a team that skips formal testing, and lets users discover the problems, has moved defect discovery to the most expensive point of all. That is the core argument for taking every phase seriously, rather than rushing the early ones on the way to writing code.

Table 1.7

The 6 Phases at a Glance

Here are the six phases at a glance. Planning confirms the need and defines scope, producing a project proposal or feasibility summary. Analysis captures what the system must do, producing a requirements document. Design decides how it will be built, producing a design specification. Implementation builds the working system, producing working code. Testing verifies the system meets its requirements, producing test results and a defect log. And maintenance supports and updates the system in use, producing update, patch, and support records.

Key Terms

The Vocabulary of This Section

Let's lock in the key terms. The S D L C is the structured sequence of phases a system passes through, from an identified need to retirement or replacement. A requirement is a specific, documented statement of something the system must do. A design specification documents how the system will be structured and built. A defect is a flaw, where the system's behavior does not match its requirements. And maintenance is the ongoing work of supporting, correcting, and updating a system already in use.

Key Takeaways

What to Carry Forward

To pull this together. The systems development life cycle is a structured, repeatable path, from an identified need through active use and eventual replacement. Its six generic phases are planning, analysis, design, implementation, testing, and maintenance. Planning confirms why a project exists. Analysis captures what the system must do. Design decides how it will be built. Implementation builds it, testing verifies it, and maintenance supports it, often feeding the next round of planning. And a problem caught in an earlier phase costs far less to fix, because less work has been built on top of it.

About Software Engineering at UPI Study

Software Engineering (Computer Science 301) is a self-paced online course of 103 video lessons in 15 chapters, from process models and agile to requirements, design, user interfaces, reliability, security and project management. It carries a NCCRS credit recommendation for 3 semester credits.

Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Compare: Software Engineering vs Systems Analysis

Why take it here

Why students take Software Engineering with UPI Study

How professional software gets builtSoftware Engineering covers how teams turn requirements into working, maintainable software: process models, agile, requirements, design, testing, reliability and project management. It is a core course in computer science and software degrees.
Credit at a fraction of the priceThe same 3 credits can cost $750 or more at a US college. Here it is one payment, self-paced, with lifetime access.
Finish your degree soonerTransfer credits reduce the courses you still owe, so you can graduate earlier or lighten a heavy semester.
Strengthen an applicationA completed college-level course on an official transcript shows admissions and scholarship committees you can do the work.
Study on your own scheduleNo start dates, no deadlines. Watch the lessons, practice, and take the final when you are ready.
130,000+students helped with college creditsACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Where the credit goes

Universities that work with NCCRS

Software Engineering carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.

FAQ

Questions students ask us

About Walking Through the Systems Development Life Cycle

What is the systems development life cycle (SDLC)?
The systems development life cycle is a structured sequence of phases a system passes through, from the moment a need is identified until it is retired or replaced. It gives every project a shared, repeatable path of checkpoints, deliverables and responsibilities. Named process models arrange, combine or repeat its phases differently, but the generic phases stay recognizably the same underneath.
What are the six phases of the SDLC?
The six generic phases are planning, analysis, design, implementation, testing and maintenance. Planning confirms the need and scope, producing a proposal or feasibility summary. Analysis captures requirements in a requirements document. Design produces a design specification. Implementation produces working code. Testing yields test results and a defect log. Maintenance produces update, patch and support records.
Why is the SDLC drawn as a loop instead of a straight line?
The SDLC is drawn as a loop because maintenance often surfaces new needs, and those needs start the next round of planning. Maintenance begins once a system is in active use and usually lasts longer than all the other phases combined. It covers fixing defects found in real-world use, adapting to a changing environment and supporting users, which naturally generates new requirements.
What is the difference between the analysis and design phases of the SDLC?
Analysis answers what the system must do, while design answers how it will do it. Analysis gathers and documents requirements from the people who will use the system and becomes the standard later phases are measured against. Design then decides the overall structure, how data is organized and stored, the user interface and how the parts communicate. A requirement missed in analysis cannot be designed around later.

About the Software Engineering course

How many college credits is Software Engineering?
Software Engineering (Computer Science 301) carries a NCCRS credit recommendation for 3 semester credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
How much does Software Engineering cost and what is included?
$250, paid once, with lifetime access: all 103 video lessons, a practice quiz after each, the graded work and final exam, and an official transcript when you finish. Students who want several courses choose UPI Study PRO instead.
Which universities accept UPI Study credits?
UPI Study has signed partner agreements with universities such as Thomas Edison State University, University of the People and Charter Oak State College, and works with universities such as Penn State, SNHU and SUNY. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities. Use "Find my college" on this page to check yours.
How long does Software Engineering take?
It is self-paced with no deadlines. The 103 lessons total about 11 hours of video; most students add reading and practice time and finish in a few weeks to a few months, on their own schedule.
How are the exams done?
Quizzes and assignments are online in the course. The final exam is taken online with proctoring; a person on the UPI Study team checks assignments, usually within two days.
How do my credits reach my college?
When the course shows 100% complete, request the official transcript from your dashboard. It is sent to the college you name, and you can send it to more than one. Check your college first with "Find my college" on this page, or ask Athena.

Ready for the full course? Earn 3 credits in Software Engineering.

103 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.

Software Engineering
3 credits · NCCRS
Enroll →