Excellence in Practice: Applying TQM and Learning from Coca-Cola's Global Expansion

UPI Study › Courses › Globalization and International Management › Free lessons › Lesson 2.10 Free lesson

Excellence in Practice: Applying TQM and Learning from Coca-Cola's Global Expansion

Globalization and International Management · Chapter 2: The International Manager: Mindset, Competence, and Cross-Cultural LeadershipSection 2.10 · lesson 23 of 7312 min · free to watch

← Reading Between the Lines: Building the Cross-Cultural Skills Global Business DemandsNext lesson: The Case for Going Virtual: Benefits of Distributed Teams in Global Organizations →

Earn 3 college credits for Globalization and International ManagementRecommended for credit by NCCRS · Business 309 · self-paced · in UPIStudy PRO, $99 a month

In this lesson

Total quality management and the PDCA cycle in a firm expanding abroad.

  • Define quality and total quality management, and name TQM's four core ideas
  • Explain the Plan-Do-Check-Act cycle and the quality pioneers linked to it
  • Describe the challenges of carrying TQM to operations in other countries
  • Apply TQM and PDCA to a fictional organization expanding across borders

Free study notes

Get this lesson's notes by email

The key points and 4 practice questions with answers, in your inbox. One email, free.

One email. Unsubscribe in one click.

Transcript

Everything said in the video, section by section (1,616 words). Read along, or search it.

Opening Scenario

Why the Cafeteria Pizza Arrives Cold

Picture a school cafeteria, where pupils keep complaining that the pizza arrives cold. One fix is to shout at the cook.

Another is to ask where the pizza loses its heat. The oven? The cart? The long hallway? You test a warming box, check whether it helps, and keep it if it does.

The second approach does not blame a person. It treats quality as a thing everyone can steadily improve. That idea has a name. And it travels across borders, better than you might think.

By the end, you will be able to define quality, and total quality management, and name its four core ideas. You will explain the Plan-Do-Check-Act cycle. You will also name the people linked to it. And you will be able to apply total quality management to a growing organization, expanding across borders, using a clearly labeled, fictional teaching version.

Definitions

Quality as Fitness for Use

Start with the words themselves.

Quality can be defined simply, as how well a product or service meets what its customers need.

The quality pioneer Joseph Juran was an American engineer and consultant. He described quality as "fitness for use": the bike does the job the rider bought it for.

So a bike that is beautiful, but whose brakes squeak on wet hills, has low quality in this sense. Even if it looks excellent. Quality is judged by the job, not the shine.

Total quality management, or TQM, is an approach in which everyone in an organization, not only a quality department, works continuously to improve products, services, and processes, with the customer as the guide.

The word "total" means every person, and every step. Not a team of inspectors at the end of the line. Everyone, all the way through.

Two names are closely linked with these ideas. W. Edwards Deming, an American statistician and consultant. And the engineer who described fitness for use. Both taught quality methods. And both are often credited with influencing manufacturing in Japan, after the Second World War.

Central Tool

The Plan-Do-Check-Act Cycle

Deming also set out a list, known as his 14 points for management. And Juran proposed a "quality trilogy" of planning, control, and improvement.

You do not need to memorize those lists. You need the main spirit. Build quality into the process. Do not rely on inspecting problems out, at the end.

A simple tool sits at the center of TQM. The Plan-Do-Check-Act cycle is also called PDCA. It is a four-step loop for improving anything.

Plan: study the problem, and decide what to try. Do: try it, on a small scale. Check: measure whether it worked. Act: adopt the change if it worked. Or adjust, and try again.

After Act, the next lap begins, with a new Plan. So the improvement never really ends.

It is often called the Deming cycle. But the cycle is generally traced to an earlier idea from another quality pioneer. The statistician popularized it. Later, Deming favored "Plan-Do-Study-Act", to stress learning from the results.

Quick Example

Running the Cycle on Cold Pizza

Think back to the cold pizza. Plan: find where the heat goes. Do: test one warming box. Check: is the pizza warmer? Act: keep the box, or try something else. The cafeteria was running the cycle, without knowing its name.

Core Ideas

Customer Focus, Kaizen, Involvement, Process Thinking

Next, the ideas that hold the whole approach up.

Many books list slightly different principles. But four appear on almost every list. And they are enough to work with.

The first is customer focus. Quality is judged by the customer. So the firm studies what its customers value. And it treats the next step in its own process, as a customer too.

That second part is easy to miss. The team that paints the frame is a customer of the team that welds it. A bad weld is a quality problem, long before any rider sees the bike.

The second is continuous improvement. Small, steady gains are expected, every day. The Japanese word kaizen, meaning change for the better, is often used for this.

The third is employee involvement. The people who do a job see its problems first. So they are asked for ideas, and given the power to act.

The fourth is process thinking. Results come from processes. So managers improve the process, and do not just blame the worker at the end. This links back to the systems approach, from lesson 2.4.

Visual Model

Four Pillars on a Base of Leadership

Picture the four ideas as pillars, holding up quality as the customer sees it. They stand on a base: leaders who commit to quality, and a culture where problems can be reported. A culture that welcomes bad news. Without that base, the pillars fall.

Going Abroad

A Shared Core With Local Feedback

Now, the hard part: carrying all of this to other countries.

Carrying TQM abroad is harder than at home, for reasons you already know.

Customers differ. "Fitness for use" depends on local roads, climate, and habits. The firm must decide which standards are fixed everywhere, and which are adapted. That is the tug of war from lesson 2.2.

Employee involvement meets different attitudes toward bosses. Where power distance is high, as in lesson 2.9, workers may hesitate to report a problem. So the firm needs safe, easy ways to speak up.

Training must work in several languages. And measurements must mean the same thing, in every plant. A "complaint" counted one way in one country, and another way elsewhere, makes the numbers useless.

A common answer is a shared core, and local feedback. The core is the set of standards that cannot vary, such as safety tests.

Local feedback is a channel, by which each country reports what its customers say, and which fixes worked. That way, every plant can learn from all the others.

Company Context

Consistency Through Many Local Bottling Partners

Now, to the name in the title.

What can be said briefly, and with confidence, about Coca-Cola, is this. It is an American beverage company, headquartered in Atlanta. Its drinks are sold in a great many countries, often through local bottling partners.

That fact alone raises a useful question, for anyone thinking about quality abroad. When a product is made and delivered by many local partners, in many places, how does the firm keep what customers experience consistent? And how does it still fit local tastes?

We will not describe the firm's own quality programs, figures, or history here. We stick to broad public facts.

Instead, we study the method through a made-up firm. So please hold this clearly in mind. What follows is fictional. It is not a description of Coca-Cola, or any real firm. It is an invented case about Brightloom Bikes, a composite case built for teaching, to show TQM at work during expansion. The numbers are illustrative.

The bike maker's plant receives complaints: the brakes squeak on wet downhills. Here is how a TQM team would use PDCA.

Fictional Case

Squeaking Brakes on Wet Downhills

Plan: Daniel's team collects the complaint records, and rides test bikes in the rain. They suspect the brake pads.

Do: they fit a different pad, on one production line, for a month.

Check: they compare complaints per 100 bikes, before and after.

Complaints fell from 12 to 5, per 100 bikes. That is a fall of 7, which is 58 percent of the starting level. All of these figures are invented.

Act: the result is good. So the pad becomes standard for Ostria. And a note goes to the Marenna partner, and to the Ashford design team.

The Act step matters as much as the others. The team writes down what changed, and why, and shares it. Without sharing, the Marenna partner would repeat the original mistake. That is how a local improvement becomes a lesson for the whole network.

Picture the network. At the center sit Brightloom's core standards: the same safety tests everywhere. Ashford handles design and test. The Ostrian plant ran the wet-hills pilot. The Marenna partner does local assembly. Standards flow out. Lessons flow back.

Common Mistake

Quality as a Slogan or a Department

One more part of the teaching version. Daniel worried that his team would not report problems. In his plant, people were used to waiting for instructions.

So he started a weekly, ten-minute round, called "what slowed you down", with no names written down. And he thanked the first person who spoke up.

Within a few weeks, the ideas came easily. And the brake-pad suggestion came from a line worker. The person closest to the problem, saw it first.

A common mistake is treating TQM as a slogan, or a department. Without real measurement, small tests, and listening to the people who do the work, the posters say "quality", and nothing changes.

Equally, do not assume that a method which worked in one place, works unchanged in another. Test it, as PDCA says.

A pro tip. When a problem appears, ask "what in the process allowed this?" before asking "who did this?" You will get more honest answers, and find the cause sooner.

Try It Yourself

A One-Week Personal Improvement Cycle

Try this, on your own. Pick a small problem in your own life, such as a messy backpack, or forgotten homework. Write one line for each PDCA step. Describe the change you will try. How you will measure it, for a week. And what you will do after. Then run it, for a week.

Key Takeaways

Quality Improvement Across Borders

Let's pull it together.

Quality is how well a product meets customers' needs: fitness for use. TQM means everyone improving everything, all the time, with the customer as the guide. PDCA, plan, do, check, act, is its central tool, and it never stops.

The four core ideas are customer focus, continuous improvement, employee involvement, and process thinking. Abroad, keep a shared core of standards, and build local feedback, so every unit learns from the others.

Next, in lesson 3.1, you will move from the manager to the team, and see the benefits of virtual teams, spread across the world. This lesson was made by UPI Study.

About Globalization and International Management at UPI Study

Globalization and International Management (Business 309) is a self-paced online course of 73 video lessons in 9 chapters, from the global business landscape and the international manager to virtual teams, global staffing, trade, protectionism, political and economic environments, foreign investment and exchange rates. It carries a NCCRS credit recommendation for 3 semester credits.

Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Compare: International Business vs Globalization and International Management

Why take it here

Why students take Globalization and International Management with UPI Study

Manage across bordersGlobalization and International Management explains how companies work across countries: global strategy, cross-cultural leadership, virtual and multicultural teams, international staffing, trade and trade policy, political and economic risk, foreign investment and currencies. It is a common course in business administration, management and international business degrees.
Credit at a fraction of the priceThe same 3 credits can cost $750 or more at a US college. Here it comes with UPIStudy PRO at $99 a month, self-paced, with every other PRO course.
Finish your degree soonerTransfer credits reduce the courses you still owe, so you can graduate earlier or lighten a heavy semester.
Strengthen an applicationA completed college-level course on an official transcript shows admissions and scholarship committees you can do the work.
Study on your own scheduleNo start dates, no deadlines. Watch the lessons, practice, and take the final when you are ready.
130,000+students helped with college creditsACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Where the credit goes

Universities that work with NCCRS

Globalization and International Management carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.

FAQ

Questions students ask us

About Excellence in Practice: Applying TQM and Learning from Coca-Cola's Global Expansion

What is total quality management?
Total quality management, or TQM, is an approach in which everyone in an organization, not only a quality department, works continuously to improve products, services, and processes, with the customer as the guide. The word total means every person and every step. Its spirit is to build quality into the process rather than inspecting problems out at the end.
What are the four steps of the PDCA cycle?
PDCA stands for Plan, Do, Check, Act. Plan means studying the problem and deciding what to try. Do means testing it on a small scale. Check means measuring whether it worked. Act means adopting the change or adjusting and trying again, which starts the next loop. It is often called the Deming cycle, and Deming later preferred Plan-Do-Study-Act.
What does fitness for use mean in quality management?
Fitness for use is Joseph Juran's description of quality: a product has high quality when it does the job the customer bought it for. A bicycle that looks beautiful but has brakes that squeak on wet hills has low quality in this sense. Quality is judged by how well the product meets customer needs, not by appearance alone.
Why is TQM harder to apply in a multinational company?
Abroad, customers differ, so fitness for use depends on local roads, climate, and habits. Where power distance is high, workers may hesitate to report problems, training must work in several languages, and measurements must mean the same thing in every plant. A common answer is a shared core of fixed standards, such as safety tests, plus local feedback so every unit learns from the others.

About the Globalization and International Management course

How many college credits is Globalization and International Management?
Globalization and International Management (Business 309) carries a NCCRS credit recommendation for 3 semester credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
How much does Globalization and International Management cost and what is included?
Globalization and International Management comes with UPIStudy PRO: $99 a month for every PRO course, including all 73 video lessons of Globalization and International Management, a practice quiz after each, the graded work and final exam, and an official transcript when you finish.
Which universities accept UPI Study credits?
UPI Study has signed partner agreements with universities such as Thomas Edison State University, University of the People and Charter Oak State College, and works with universities such as Penn State, SNHU and SUNY. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities. Use "Find my college" on this page to check yours.
How long does Globalization and International Management take?
It is self-paced with no deadlines. The 73 lessons total about 14 hours of video; most students add reading and practice time and finish in a few weeks to a few months, on their own schedule.
How are the exams done?
Quizzes and assignments are online in the course. The final exam is taken online with proctoring; a person on the UPI Study team checks assignments, usually within two days.
How do my credits reach my college?
When the course shows 100% complete, request the official transcript from your dashboard. It is sent to the college you name, and you can send it to more than one. Check your college first with "Find my college" on this page, or ask Athena.

Ready for the full course? Earn 3 credits in Globalization and International Management.

73 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.

Updated

Globalization and International Management
3 credits · NCCRS
Enroll →