Professional Ethics and Best Practices in Project Management

UPI Study › Courses › Project Management › Free lessons › Lesson 1.9 Free with a free account

Professional Ethics and Best Practices in Project Management

Project Management · Chapter 1: Foundations and Framework of Project ManagementSection 1.9 · lesson 9 of 7311 min · free with a free account

← Global Project Management: Success StrategiesNext lesson: From Concept to Kickoff: Project Initiation →

Earn 3 college credits for Project ManagementRecommended for credit by NCCRS · Business 230 · self-paced · one payment, lifetime access

In this lesson

Applying professional values when rules do not settle a decision.

  • Distinguish ethics from law and describe four core professional values
  • Classify conflicts of interest as real, potential or apparent and respond correctly
  • Calculate honest percent complete and identify misreporting
  • Apply a step-by-step method to resolve an ethical dilemma

Free study notes

Get this lesson's notes by email

The key points and 4 practice questions with answers, in your inbox. One email, free.

One email. Unsubscribe in one click.

Transcript

Everything said in the video, section by section (1,441 words). Read along, or search it.

Opening Dilemma

Reporting 65 Percent as 75

Nadia manages a clinic refurbishment for a building contractor. The client's next payment is tied to a milestone: seventy-five percent complete. By her count of finished, checked work, the project is at sixty-five percent. Her manager, Grant, mentions that the company is short of cash this month, and says the report could reasonably say seventy-five. No rule in the contract spells out how to round. So how does anyone decide what's right, when the rules don't settle it?

Definition

Ethics Versus Law

Ethics is the set of principles about right and wrong conduct, that guide choices where no rule gives the answer, or where the rule alone isn't enough. Law is the body of rules made and enforced by governments and courts. The two overlap, but they're not the same. What's legal can still be unethical. A technically true, but misleading, progress statement may be lawful, and still dishonest. And the law is a floor, not a ceiling. Professional ethics usually asks for more. Legal questions themselves go to counsel or compliance, not to guesswork. The ethical thinking continues alongside that advice.

Core Values

Responsibility, Respect, Fairness and Honesty

Professional codes of conduct tend to share four values: responsibility, respect, fairness and honesty. Responsibility is owning your decisions and their consequences, mistakes included. A scheduler whose estimate caused a missed handoff says so the same day. Respect is treating people, their information and their time with consideration, whatever their rank. You credit the junior tester whose idea you used. Fairness is deciding impartially, on agreed criteria, without favoritism. A panel scores every bidder against the same published criteria. Honesty is telling the truth accurately and completely enough that others can rely on it: a milestone two weeks late, and why. Values stay vague until they're tied to actions someone else could watch.

Conflict of Interest

Real, Potential and Apparent Conflicts

The first recurring problem is a conflict of interest: when personal interests, like money, family, friends or future jobs, could influence, or seem to influence, a professional judgment. A real conflict is when the interest actually bears on a decision you're making, like scoring a bid from a firm you hold shares in. A potential conflict could become real as circumstances develop. An apparent one is where a fair-minded observer could suspect bias, even if you're confident there's none. The person with the interest is the least reliable judge of its effect. So the responses don't wait for proof of bias. Disclose it to the sponsor or compliance contact before it affects a decision, and record that you did. Or step aside, and let someone without the interest decide. Disclosure costs little. A hidden interest found later damages trust in every decision the person touched.

Quick Check

A Brother Planning to Bid

Quick check. Next month, a manager's brother plans to bid on a contract the manager will help evaluate. No bids have been opened yet. Real, potential, or apparent? Pause, and decide. Potential. Nothing is being decided yet, but it becomes real the moment the manager scores that bid. So the manager should disclose now, and step aside from that evaluation, before it starts.

Confidentiality

Confidentiality Is Not Secrecy

Confidentiality is the duty to protect information shared in trust, and to use it only for the purpose it was shared for: a client's plans, a vendor's prices, a colleague's personal circumstances. It isn't secrecy. Secrecy hides information from people entitled to it. Confidentiality limits it to those with a legitimate need. Keeping one bidder's price from its competitors is confidentiality. Withholding a known safety problem from the people responsible for safety is not. And the duty has limits. Where the law requires disclosure, or silence would leave people at serious risk, it gives way. Ask counsel or compliance first.

Gifts

Gifts, Inducements and Policies

Meanwhile, Nadia's junior coordinator, Leo, is choosing between two flooring suppliers. One is a little cheaper. The other has invited him to a weekend event. A gift is anything of value given without payment. An inducement is one offered, or seen as offered, to influence a decision. Three features shape how a gift looks. Its value. Its timing: an offer while a decision is pending carries more risk. And the relationship: does the giver gain from your choice? Many organizations write a gifts policy: what you may accept, must decline, or must report. Policies range from small limits with a log, to a ban on gifts from bidders. Under any policy, follow it, and when it's silent or unclear, ask before accepting, and record the answer. Policy design is debated. A total ban is easiest to audit. A threshold with disclosure respects ordinary courtesy, and stops it going underground.

Honest Reporting

Percent Complete From Checked Units

Honest reporting gives sponsors, clients and teams status that is accurate, complete enough to use, and early enough to act on. Status matches the evidence, not the hope. Bad news goes early: a problem raised in week three has options, and in week twelve it usually has none. Misreporting is presenting status falsely or misleadingly, by an untrue statement, or by arranging true ones to create a false picture. Rounding up progress is misreporting. Percent complete is completed units divided by total units, times a hundred. In a fit-out with twenty planned units, fourteen are done and checked: seventy percent. A report of ninety percent claims eighteen units. Eighteen minus fourteen is four units that don't exist: a fifth of the whole project. A good-faith forecast, labeled as a forecast and based on evidence, is fine. Stating something as done when the evidence says otherwise is not.

Quick Check

Counting Units That Do Not Exist

Quick check. A project has thirty planned work units, and twenty-one are done and checked. A status report says ninety percent complete. How many of the units it claims don't exist? Pause, and work it out. Six. Ninety percent of thirty is twenty-seven units. Twenty-seven minus twenty-one is six. The honest figure is seventy percent: twenty-one divided by thirty.

Decision Method

Working Through an Ethical Dilemma

For any dilemma, a fixed sequence helps, because pressure pushes people toward the first idea that relieves the discomfort. Nadia works through it. Identify the facts. Her figure comes from completed, checked work, sixty-five percent. Name those affected: the client, staff and subcontractors, future patients, Grant, and herself. Name the values in conflict: honesty and fairness to the client, against responsibility to colleagues who need the cash. List the options, including a middle one. Report seventy-five. Or report sixty-five with the evidence, and ask the client for an early partial payment for verified work. Weigh the consequences. Seventy-five brings cash, but the client pays for work that doesn't exist, and discovery would harm everyone. Sixty-five is honest, though the payment isn't guaranteed. Decide: she reports sixty-five, proposes the partial payment, and tells the anxious client plainly when the milestone will be met. Escalate or document. If Grant still insists, she takes it to a more senior manager or the ethics contact, and records the instruction. At any step, she can seek advice.

Debate

Internal Routes or Outside Authorities

One part of this is genuinely contested: must you always use internal routes first? One position says yes, almost always. Organizations deserve a chance to correct themselves, internal routes are faster, and outsiders lack context. The other says that where public safety is seriously at risk, or internal concerns were already ignored, going to an outside authority at once is reasonable. This course takes no side. Where law or safety is involved, qualified advice comes first.

Best Practices

Documentation, Lessons and Improvement

Ethical behavior takes courage, but the working environment can make it cheaper. Three practices help. Documentation records decisions, assumptions, instructions and their reasons where others can find them. A written record protects the person who acted correctly. A lessons-learned culture reviews what went well and badly, openly, treating problems as information, not occasions for blame. Where blame rules, people hide bad news. Continuous improvement makes small, evidence-based changes to how work is done. Each concern raised becomes a reason to adjust a policy or checklist. Together, documentation supplies the evidence, reviews share it, and improvement changes practice. They make honesty the easier choice.

Case Resolution

Honest Figure, Legitimate Payment

Back in the clinic, Nadia gives Grant her report: sixty-five percent, with the checked work listed, and a request for an early partial payment for what's verified. Grant isn't pleased. But the partial payment eases the cash strain through a legitimate route, and nobody has to explain a false figure later. That's the answer to the opening question. When rules are silent, values tied to observable actions, and a fixed method, decide what's right.

Key Takeaways

Values Shown as Actions

To recap. The law is a floor, and ethics asks for more. Four values, responsibility, respect, fairness and honesty, show up as actions others can see. Disclose conflicts of interest, protect what's confidential, and ask before accepting a gift. Report status from the evidence, not the hope. And use the method: facts, affected people, values, options, consequences, decide, then escalate or document.

About Project Management at UPI Study

Project Management (Business 230) is a self-paced online course of 73 video lessons in 12 chapters, from starting and defining a project to planning, budgets, scheduling tools, proposals, contracts, execution, monitoring, closure, teams and certification. It carries a NCCRS credit recommendation for 3 semester credits.

Every lesson transcript is free on pages like this one, and the videos are free with a free UPI Study account. Enrolling adds a practice quiz after each lesson, the graded work and final exam that earn the credit, lifetime access, and an official transcript on completion. UPI Study has helped over 130,000 students with college credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Why take it here

Why students take Project Management with UPI Study

How projects are planned, run and closedProject Management teaches how to deliver work on time and on budget: scope, schedules, the critical path, budgets and earned value, risk, contracts, monitoring and closing a project, and leading the team. It is a common course in business, management and engineering degrees.
Credit at a fraction of the priceThe same 3 credits can cost $750 or more at a US college. Here it is one payment, self-paced, with lifetime access.
Finish your degree soonerTransfer credits reduce the courses you still owe, so you can graduate earlier or lighten a heavy semester.
Strengthen an applicationA completed college-level course on an official transcript shows admissions and scholarship committees you can do the work.
Study on your own scheduleNo start dates, no deadlines. Watch the lessons, practice, and take the final when you are ready.
130,000+students helped with college creditsACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Where the credit goes

Universities that work with NCCRS

Project Management carries a NCCRS credit recommendation. These universities work with NCCRS; some are UPI Study's signed partners. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.

Find my college → Not listed? Ask Athena in the corner of this page, or book a 15-minute call.

FAQ

Questions students ask us

About Professional Ethics and Best Practices in Project Management

What is a conflict of interest in project management?
A conflict of interest exists when personal interests such as money, family, friends or future jobs could influence, or seem to influence, a professional judgment. It is real when the interest bears on a current decision, potential when it could become real, and apparent when a fair observer could suspect bias. The usual responses are to disclose it early and record that, or step aside.
How do you calculate percent complete honestly?
Percent complete is completed and checked units divided by total planned units, times 100. With 14 of 20 units done, the project is 70 percent complete. Reporting 90 percent would claim 18 units, so 4 units, a fifth of the project, would not exist. A good-faith forecast labeled as a forecast is acceptable; stating unfinished work as done is misreporting.
What are the four values in project management codes of ethics?
Professional codes, including PMI's Code of Ethics and Professional Conduct, commonly center on responsibility, respect, fairness and honesty. Responsibility means owning decisions and mistakes. Respect means treating people, their information and their time with consideration. Fairness means deciding impartially on agreed criteria. Honesty means telling the truth accurately and completely enough that others can rely on it.
What is the difference between confidentiality and secrecy?
Confidentiality limits information shared in trust to people with a legitimate need, while secrecy hides information from people entitled to it. Keeping one bidder's price from competitors is confidentiality; withholding a known safety problem from those responsible for safety is not. The duty gives way where law requires disclosure or silence would put people at serious risk, ideally after consulting counsel or compliance.

About the Project Management course

How many college credits is Project Management?
Project Management (Business 230) carries a NCCRS credit recommendation for 3 semester credits. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities.
How much does Project Management cost and what is included?
$250, paid once, with lifetime access: all 73 video lessons, a practice quiz after each, the graded work and final exam, and an official transcript when you finish. Students who want several courses choose UPI Study PRO instead.
Which universities accept UPI Study credits?
UPI Study has signed partner agreements with universities such as Thomas Edison State University, University of the People and Charter Oak State College, and works with universities such as Penn State, SNHU and SUNY. ACE and NCCRS have over 2,100 cooperating colleges that will consider accepting credits; the final decision is with the universities. Use "Find my college" on this page to check yours.
How long does Project Management take?
It is self-paced with no deadlines. The 73 lessons total about 15 hours of video; most students add reading and practice time and finish in a few weeks to a few months, on their own schedule.
How are the exams done?
Quizzes and assignments are online in the course. The final exam is taken online with proctoring; a person on the UPI Study team checks assignments, usually within two days.
How do my credits reach my college?
When the course shows 100% complete, request the official transcript from your dashboard. It is sent to the college you name, and you can send it to more than one. Check your college first with "Find my college" on this page, or ask Athena.

Ready for the full course? Earn 3 credits in Project Management.

73 video lessons, a quiz after each one, and the graded work that earns the credit. Recommended for credit by NCCRS.

Project Management
3 credits · NCCRS
Enroll →